Projects

We are currently managing over $2.5B in projects across a diverse range of sectors and delivery models. 

Scotty the T-Rex for the Royal Saskatchewan Museum

Regina | Design-Bid-Build | Completed 04/2019

We managed the creation of a new space for Scotty, the largest Tyrannosaurus rex ever discovered. Delivered the project through an extremely strict schedule, with the project lasting for 7 months from design to construction. 

The project involved the use of our custom collaborative approach that blends the construction management and progressive design-build delivery models. This led us to win the prestigious Project Management Institute’s 2019 Project of the Year Award. For this project, we combined our custom approach with the maximization of just-in-time decision-making to crash the schedule by six months. 

Saskatchewan Polytechnic New Saskatoon Campus
Saskatoon | Design-Build & Construction Management at Risk  | In progress
A new post-secondary campus with services spanning across the planning and subsequent phases. The first sequence includes a Design-Build for a new facility, followed by a Construction Management at Risk package for the renovations package.

Minahik Waskahigan High School Replacement
Pinehouse | Design-Bid-Build | In progress
Overseeing the replacement of a remote, grades 7-12 high school replacement in Pinehouse, SK. The replacement is 33,368 sqft in size and includes an integrated 32-seat childcare facility. The existing school is to be demolished upon completion of the new build. The school primarily serves the Indigenous population, including Cree, Dene, and Métis students, as well as French and English students.
 

Holmwood Joint-Use High School 
Saskatoon | Design-Bid-Build | In progress
A new construction of over 430,000 sqft within the Holmwood area of Saskatoon, SK, representing the largest education project in the province. 
In collaboration with Group2 Architecture + Interior Design, we previously completed the school's test-fit study.

Campbell Collegiate Vocational Wing Modernization
Regina | Design-Bid-Build | In progress
A rebuild of Campbell Collegiate’s vocational wing and the renovation of an existing, adjacent facility within an operational environment. 
The vocational wing needs to be demolished. ~1,800 sqm of the wing will be rebuilt with an additional ~1,000 sqm of renovations to the facility adjacent to the vocational wing.  

Greenall High School Modernization and Expansion
Balgonie | Design-Bid-Build | In progress
A renovation, expansion, and modernization involving the replacement of systems nearing or at their end of life and the reconfiguration of spaces to align with 21st-century learning.

Conseil des École Fransaskoises Schools
Saskatoon & Prince Albert | Design-Bid-Build | In progress
The design, development, and execution of two new schools in Saskatchewan. The Saskatoon school will accommodate Pre-K-6 students (5,031 sqm) with 80 childcare spaces, the Prince Albert school Pre-K-12 students (4,863 sqm) with 51 childcare spaces, and each with 2 preschool programs.

South Corman Park K-12 School
Casa Rio | Design-Bid-Build | In progress
The delivery of a new 5,989 sqm K-12 school. 

Brighton Joint-Use Elementary School
Saskatoon | Design-Build | In progress
Overseeing the development of a new K-8 joint-use elementary school ~22,000 sqm in size, with 2,050 students and a 90-seat childcare centre. 

Aspen Ridge Joint-Use Elementary School
Saskatoon | Design-Bid-Build | In progress
The design, development, and execution of a new joint-use elementary school in Saskatoon. The project is being delivered on behalf of two school divisions and two ministries. 

Harbour Landing West Joint-Use Schools
Regina | Design-Bid-Build | In progress
A new construction of a pre-kindergarten to eighth grade joint-use school.

University of Saskatchewan Bowl Rehabilitation 
Saskatoon | Design-Bid-Build | In progress
We led the first phase of the University’s ongoing rehabilitation project. 

Regina Catholic School Division Portables
Regina | Design-Bid-Build & Construction Management | Completed 11/2025
Oversaw the deployment of 19 portable classrooms across multiple sites.  

Provincial K-12 School Design Standards
Saskatchewan | Project Delivery | Completed 07/2024
New design standards to be implemented on all school projects within Saskatchewan.

Regina Argyle and St. Pius X Joint-Use Schools
Regina | Design-Bid-Build | Completed 09/2023
A new facility to consolidate two individual schools into a unified space with collaborative areas for both educational and community use.

Community School Dene Building Renovation
La Loche | Design-Bid-Build | Completed 01/2019
The substantial renovation of a high school deeply affected by a tragic shooting. 

P3 Joint-Use Schools

Saskatchewan | Public-Private Partnership | Completed 09/2019

18 elementary schools on nine distinct sites delivered on behalf of two ministries, five school divisions, and a comprehensive team of consultants.

North Regina Joint-Use School


Regina, SK | Design-Bid-Build | Completed 10/2025

A new 10,000 sqm joint-use K-8 facility consolidating four schools into two (one public and one Catholic) with a 51-seat childcare and City community centre.

Weyburn General Hospital
Weyburn | Design-Build | In progress
The replacement of an existing medical facility, increasing occupancy by 35 beds.

Prince Albert Victoria Hospital Renewal and Expansion
Prince Albert | Design-Build | In progress
A major expansion aimed at enhancing healthcare services in northern Saskatchewan, including a new multi-story acute care tower to increase capacity, with expanded emergency, surgical, maternity, and pediatric services. It will also feature the region’s first MRI, a rooftop heliport, and a dedicated First Nations and Métis cultural space.

Regina Specialized Long-Term Care
Regina Progressive Design-Build | In progress
Completed the business case and currently managing the implementation of the replacement of a 240-bed specialized long-term care facility.

Saskatoon Cancer Patient Lodge 
Saskatoon Design-Bid-BuildIn progress
Completed the business case and currently managing the implementation of the new multi-suite, 47-bed facility.

Grenfell Long-Term Care
Grenfell | Design-Bid-BuildIn progress
A new long-term care facility in Grenfell, SK.

Urgent Care Centre Saskatoon
Saskatoon | Design-Bid-Build | Completed 07/2025
A centre offering same-day treatment for minor illnesses and injuries, mental health conditions, and addictions.

Saskatchewan Hospital North Battleford Audit
North Battleford | Project Delivery | Completed 08/2020
An audit of the quality of materials, equipment, labour, and workmanship during construction, and a review of processes used during design, construction, and operations.

Urgent Care Centre Regina

Regina | Construction Management | Completed 06/2025

The first of kind in Saskatchewan, patients in Regina requiring same-day treatment for minor illness and injuries can be treated at the Urgent Care Centre (UCC) rather than the emergency room. The UCC also offers mental health and addictions support.

We were engaged to provide project management services during the construction phase. We led the team through construction, commissioning and oversight of the furniture and equipment delivery and installation.  

Regina Transit Garage Electrification
Regina | Design-Bid-Build & Construction Management | In progress
A major transformation to upgrade the City's fleet of buses to electric, upgrade the bus barn, and equip the transit operation buildings to be equipped with charging infrastructure.

Provincial Childcare Design Standards
Saskatchewan Project Delivery | In progress
Standardized floor plans to aid in meeting regulatory and spatial requirements as well as industry design standards.

Métis Nation—Saskatchewan Tiny Homes
Saskatchewan | Design-Build | In progress
The delivery of six and site preparation of eight new tiny homes within five remote communities across Northern Saskatchewan. 

Jubilee Residences Jubilee Terrace
Saskatoon | Progressive Design-Build | In progress
An affordable housing project including a 36-unit apartment-style building intended to support the needs of seniors, women, people with disabilities, and Indigenous people.

Jubilee Residences — Stensrud Lodge Renovations
Saskatoon | Design-Bid-Build | In progress
Renovations to the Lodge’s sundeck, solarium, and food services space across two phases of work.

Elmwood Residences — Elmwood Community Hub
Saskatoon | Construction Management | In progress
A capital initiative centered around belonging, inclusion, community connection, and improved quality-of-life outcomes for individuals with intellectual disabilities. 

Winnipeg Alexander Docks
Winnipeg | In progress
The demolition of a historic, significantly deteriorated structure in Winnipeg, MB. 

Regina Women's Correctional Centre 
Regina | Construction Management at Risk | In progress
A new 300-bed women’s correctional centre with four general population units, one medical unit, an admissions unit, and a medical healthcare clinic, as well as food services, administration, and other service/multi-use areas. 

Neufeldt Residence
Saskatoon
| Design-Build | In progress
The construction of Neufeldt Residence from the construction phase to closeout. 

Tourism Saskatchewan Regina Office
Regina | Design-Bid-Build | Completed 06/2025
Office renovation in Regina, SK.

Tourism Saskatchewan Saskatoon Office
Saskatoon
| Design-Bid-Build | Completed 10/2023
Office renovation in Saskatoon, SK.

Regina Police Services Headquarters

Regina, SK | Design-Bid-Build & Construction Management | Completed 08/2025

This project involved the phased implementation of a campus solution for the Regina Police Services (RPS) headquarters building. It included the construction of a new link building to connect two existing buildings, forming one unified and cohesive facility (Phase 1). 
In addition to the new construction, the project  encompassed extensive renovations to the two existing buildings, along with all associated site and civil work required to support the campus development (Phase 2).

This project required us to balance public accessibility with stringent security needs, resulting in an efficient and secure environment for all RPS operations. Key security features included interview room surveillance equipment, evidence storage, a prisoner release area and protocol, sound/privacy protection, ballistics paneling, and elevator and door security throughout the facility to control access. Additional features included a dedicated area for records checks, public access to computer stations, and a media scrum area for press releases and training.